You are here: Home1 / STONEGATE BANK
- Scope of Work: Retrofitted Outdoor Parking lot, Replaced 30′ Poles, Installed Floods to illuminate open Atrium Area, Security wall packs/flood lamps
- Energy Savings %: 73.48%
- Payback Period: 2.91 Years
- Annual ROI %: 34.35%
Scroll to top